Room Addition, ADU Services in Temecula & Murrieta, CA
ADUs, Guest Homes, In law suites, Rental Units, Garage Conversions, Granny Flats
Room Additions (ADUs) Are Now Easier Then Ever To Build.
New California State laws as of Jan 1st. 2020. We can now build ADUs on residential property with only a 4 ft setback from your property line. You are allowed up to three units on your property and none have to be owner occupied. You may also now convert your existing garage to living space and not be required to add parking or a new garage. We are room addition experts and can answer any and all your questions. California's new laws no longer let city county HOA or CC&Rs to say no to ADUs.
Temecula / Murrieta #1 ADU / Room Addition Builder
8-12 WEEK BUILD TIMES!
Detached ADU in Murrieta. 600 sq.ft. bathroom, kitchen, bedroom laudnry and living room.
Custom built ADU in Murrieta.
Murrieta ADU attached with a separate entry for ultimate privacy and dual living quarters.
A look at an adu kitchen which is similar to an apartment sized kitchen.
1000 sq. ft. ADU in Murrieta with amazing finishes and details to match the exsiting home.
Stone, siding, stucco details all to match with the existing residence.
This adu has a full kitchen ready to service the needs of the homeowner.
Amazing curbless walk in shower and oversized vanity.
Stackable laundry area with tons of storage.
Great bedroom space with lighting, ceiling fan, and lvp flooring.
Nice open concept ADU with plenty of space.
Underground plumbing, footings, forms all ready for inspection.
After utilities and underground pass inspection, we backfill and are ready for concrete.
Concrete is poured and we are ready in a few days to frame the walls and roof.
Walls go up, trusses are on site and this ADU room addition is on its way.
Framing is complete and windows are installed. After inspection roof is dried in, and all rough plumbing, electrical, HVAC begins.
Roof, lath, and all rough in is completed.
Insulation is installed and Drywall is hung.
After scratch and brown coat the final color coat is completed 7 days later.
Paint, cabinets, trim, countertops, and flooring are completed to finish out this ADU room addition.